- I SUGGEST KEEPING ALL DOCUMENTATION PERTAINING TO SEALS WITHIN BOAT AT ALL TIMES FOR NOW, TILL ALL PROTOCOLS AT ALL LAKES ARE RECIPROCAL.
FOLSOM SRA, WHICH INCLUDES FOLSOM LAKE AND LAKE CLEMINTINE WID DB ENTRY(YES)https://www.parks.ca.gov/?page_id=31843
NID WATER BODIES, WHICH INCLUDE SCOTTS FLAT, ROLLINS LAKE WID DB ENTRY( YES ) https://www.nidwater.com/
OROVILLE SRA AND SURROUNDING FOREBAY
starts 5/19/2025
SOLANO COUNTY LAKE BERRYESSA WID DB ENTRY(YES)https://scwa2.com/lake-berryessa-mussel-prevention-program/
TAHOE AND TAHOE BASIN, FULL INSPECTION AND DECONTAMINATION REQUIRED, SPECIAL ISSUANCE STICKERS REQUIRED https://tahoeboatinspections.com/prepare-for-inspection/
Q SEAL RED (QUARANTINED 30 DAYS)
(RE) BLUE or GREEN SEALS (EXIT & RE ENTRY SEALS WATER BODY SPECIFIC)
DECONTAMINATION SEAL(GREEN/CLEAR)
CONTAMINATED AND IMPOUNDED DOUBLE RED
NID
ACCEPTS REQ SEALS
CONTACT THEM FOR MORE INFORMATION https://www.nidwater.com/nevada-irrigation-district-mussel-prevention-program
FOLSOM SRA WILL ACCEPT NID AND BERRYESSA Q SEAL AND (RE)GREEN SEALS ONLY IF PROPERLY ENTERED INTO WID DATA BAS AND 30 DAYS HAVE PASSED FROM EXIT/ AND OR RE-ENTRY
LAKE BERRYESSA ACCEPTING QSEALS SEALS FROM FOLSOM / NID
IF PROPERLY REGISTERED INTO WID DATABASE AND HAVE BEEN DOCUMENTED.
NO BOATS FROM CONTAMINATED WATERS ALLOWED WITHOUT DECONTAMINATION SEAL, FULL DOCUMENTATION PAPERWORK PRESENTED, PROPER WID DATABASE ENTRY , THERE ARE SOME DRY TIME REQUIREMENTS FOR ALL WATER BODIES
**ALL LAKES USING WID PROTOCOLS **
****If your watercraft has received a RED seal from another lake and is currently under a 30-day quarantine, it will not be allowed to launch. However, if a RED seal is applied at another lake and the 30-day quarantine is over, the Watercraft will be allowed to launch as long as the following criteria are met:
- The watercraft information has been added to the Watercraft Inspection and Decontamination (WID) database. Many lakes applying seals use this system.
- A paper receipt is available to prove the date and location of the application of the seal.
- The lake you received the seal from has not tested positive for quagga, zebra, or golden mussel
- NID LAKES WILL ACCEPT OTHER WATER BODY SEALS IF ALL PROTOCOLS MET.
- NID REQUIRES ALL COMPLEX VESSELS TO QUARANTINE FOR 60 DAYS OR BE DECONTAMINATED BY THEIR APPROVED VENDORS
*****In order to receive a GREEN / BLUE seal upon departure from the lake, it must be during their normal business hours of the launch ramp facility. Unfortunately, if the facility is closed when the watercraft is leaving the lake, the watercraft will not be able to receive a GREEN seal and the 30 / 60 day quarantine process will start over, a decontamination will be required to bypass the 30-day quarantine
LAKE JENKINS ELDORADO COUNTY STARTED QUARANTINE REGULATIONS 4/21/25
CHECK BACK OFTEN TO SEE NEW UPDATES. SHOULD BE CONSIDERED UNDER STATE PARKS REGULATIONS CHECK WITH WATER BODY.